g
d
i
r
  • +32 3 321 45 41
Blom 18

Blom 18

At the request of Blommaert Aluminium Constructions and investment group Buysse en Partners, we assessed how the available surface area could be maximally used to facilitate the expansion of Blommaert Aluminum Constructions in the long term. The company is located in Wijnegem on the Albert Canal, between the well-known sites of Frisomat on the one hand and the site Axel Vervoordt on the other. In order to be able to realize the desired expansion, the land and building of neighboring De Backere is acquired. New premises, parking,

Tag Number 2Planning en strategie

Developing detailed 3D models for architecture, structure, and MEP (Mechanical, Electrical, and Plumbing) systems is a core component of the BIM process. EU taxonomy for precise planning and visualization of the project, ensuring all elements work together seamlessly. Through clash detection, potential conflicts between systems— such as plumbing overlapping with structural elements — can be identified and resolved early.Developing detailed 3D models for architecture, structure, and MEP (Mechanical, Electrical, and Plumbing) systems is a core component of the BIM process. EU taxonomy for precise planning and visualization of the project, ensuring all elements work together seamlessly. Through clash detection, potential conflicts between systems— such as plumbing overlapping with structural elements — can be identified and resolved early.

411493f3c2f7db4923ecb7c428089c3cba62865c
411493f3c2f7db4923ecb7c428089c3cba62865c kopie